Welcome Guest! To enable all features please Login. New Registrations are disabled.

Notification

Icon
Error

A suggestion about trip sweeps.
krush78
#1 Posted : Saturday, September 27, 2014 8:56:44 AM(UTC)
Rank: Advanced Member

Joined: 4/28/2013(UTC)
Posts: 40

Thanks: 5 times
Was thanked: 7 time(s) in 7 post(s)

I don't know if it would be possible, but on trip sweeps it would be handy if you included in the rules when the trip had to be completed by. Some of the trips are really specific on the dates they can be taken and some just have a "must be taken by" date. I'm sure that I'm not the only one that can't always take vacation on a specific date, or have used all our alloted amount of time off at work for the rest of the year; and knowing whether the dates are flexible or not would save some of us a lot of time combing through the entire rules of the sweep to just find out we couldn't take it anyway.

Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF 1.9.5.5 | YAF © 2003-2011, Yet Another Forum.NET
This page was generated in 0.026 seconds.